QuatroServe Case Study


Sludge Digester Plant
Monkmoor, Shrewsbury


DESIGN CRITERIA:

To replace existing unsafe access stairs to inspection area of 30ft high 2000gallon sludge tank.

SCOPE OF SUPPLY:

Assess existing access stairs and after identifying areas of weakness in the construction and safety of use, design new free standing 8 metre high access tower avoiding using structure of tank for support.

Designed in a multi-flight configuration the solution consists of two free standing towers fixed to the concrete base, joined by 4 flights of stairs using 34/100 mild steel openwork stair treads and three 34/100 openwork landing stages with tubular handrails throughout.

The whole assembly is galvanised to BS EN 1SO 1481 whilst the openwork complies with BS EN ISO 14122 Part 1-3 2001.

Access tower at Monkmoor sludge digester plant

Quatroserve are committed to quality with all manufacturing carried out to BS EN ISO 9001 accredited quality systems, our services are designed to meet the specific needs of the customer and we offer a reliable service built on years of industry experience.

NEXT CASE STUDY

For more information please contact us at:

Quatroserve       Tel. 01384 480326      Fax 01384 74119       Email: sales@quatroserve.co.uk